Usually, yes. Extra ground-floor space is in high demand along the M4 corridor and across Hampshire, Surrey and Berkshire, especially when the finish suits the house.
Most single-storey extensions take 8 to 14 weeks on site. If planning permission is needed, allow around 8 weeks before the build starts.
A conservatory is mostly glazed, and an orangery mixes brick piers with a glazed roof. A single-storey extension is mostly solid, so it stays warm in winter and cool in summer.
It is a ground-floor room built on new foundations, with solid walls, a proper roof and level floors, designed to blend seamlessly with your existing home.
Up to 3 m on terraced and semi-detached houses, or 4 m on detached houses. Prior approval can extend this to 6 m and 8 m, after your neighbours are notified.
Yes, we recommend it. It proves your extension is lawful, makes selling easier, and costs half the fee of a planning application.
Yes. Earlier extensions count towards your permitted development allowance, so we check your property’s history before design begins.
Up to 4 m high, with eaves no higher than 3 m within 2 m of a boundary. It must not be taller than the roof of your existing house.
Often not. Many rear and side extensions fall under permitted development. Conservation areas, Article 4 areas, flats and listed buildings need full planning permission.
If a public sewer runs close to your single storey extension, Thames Water or Southern Water must approve the work first. A CCTV drain survey early in the project helps keep the build on schedule.
For larger extensions under prior approval, the council notifies your neighbours and gives them 21 days to comment. The council only assesses the impact on neighbouring homes.
A party wall surveyor settles the disagreement with a party wall award that details the method and timing of the works. It will not block your single storey extension, but expect a short delay and additional surveyor fees.
Usually. The Party Wall Act asks you to give neighbours 1 month's notice before building on the boundary line or excavating near their foundations, and 2 months' notice before altering a shared wall.
As a guide, glazing should not exceed roughly 25% of the extension's floor area, with an allowance for any openings taken out. Larger areas of glass are possible when a SAP calculation shows the design is energy efficient enough.
Usually around 1 m deep. Clay soil and nearby trees, which are common in parts of Surrey and Berkshire, may need deeper or piled foundations.
Always, whether or not you need planning permission. Building control signs off the structure, fire safety, insulation, drainage, electrical work and ventilation of your single storey extension.